Energy & Utilities · industry data
Energy and EV sales leads and data
Updated
Track new public EV charging stations as they are listed. Public EV charging stations newly listed by the DOE Alternative Fuels Data Center, with network and location. As of Oct 10, 2026, 2,509 records are on file across 1 datasets and 14 states.
Key takeaways
- 2,509 energy and ev records are on file across 1 datasets and 14 states.
- New EV charging stations is the biggest dataset, with 2,509 records.
- California has the most records, 815.
- Aug 2026 was the busiest month in the chart, with 786.
- The newest change on any page was recorded on Oct 10, 2026.
- Records on file
- 2,509
- Last 90 days
- 2,317
- Datasets
- 1
- States
- 14
What energy and ev data is available?
1 datasets have live pages for companies selling to station operators and installers. New EV charging stations is the biggest, with 2,509 records in 14 states. Each one links to its state-by-state page.
| Dataset | Records | States | Trend | Refreshed |
|---|---|---|---|---|
| New EV charging stations | 2,509 | 14 | Daily |
100% of the energy and ev records on file are new EV charging stations.
How much energy and ev activity is recorded each month?
Across every dataset on this page, 2,317 records are dated in the last 90 days. The busiest month in the chart is Aug 2026, with 786. The records on file go back only a few months, which is too short a history to compare one period with the last.
The numbers
| Month | Records |
|---|---|
| 1 | |
| 1 | |
| 1 | |
| 625 | |
| 786 | |
| 706 | |
| 381 |
Month by month: Feb 2025 has 1 records; Jun 2025 held at 1; Aug 2025 held at 1; Jul 2026 rose to 625; Aug 2026 peaked at 786 (+26%); Sep 2026 eased to 706 (-10%); Oct 2026 eased to 381 (-46%).
Which states have the most energy and ev records?
California has the most on file, with 815 records, followed by Massachusetts with 300. The table lists the 10 states with the most records and each one's biggest page.
| State | Records | Share | Per 100,000 residents | Biggest page |
|---|---|---|---|---|
| California data | 815 | 32% | 2 | California new EV charging stations |
| Massachusetts data | 300 | 12% | 4 | Massachusetts new EV charging stations |
| New Jersey data | 235 | 9.4% | 3 | New Jersey new EV charging stations |
| New York data | 175 | 7.0% | 1 | New York new EV charging stations |
| Florida data | 148 | 5.9% | 1 | Florida new EV charging stations |
| Texas data | 144 | 5.7% | 0 | Texas new EV charging stations |
| Washington data | 131 | 5.2% | 2 | Washington new EV charging stations |
| Colorado data | 125 | 5.0% | 2 | Colorado new EV charging stations |
| Illinois data | 94 | 3.7% | 1 | Illinois new EV charging stations |
| Pennsylvania data | 89 | 3.5% | 1 | Pennsylvania new EV charging stations |
What's new in energy and ev this month
The 10 most recent records across these datasets, newest first. The company is shown where the record names one.
| Date | Record | Company | State | Value |
|---|---|---|---|---|
| EV stations | Not named | Illinois | ||
| EV stations | Not named | Illinois | ||
| EV stations | Not named | Illinois | ||
| EV stations | Not named | Illinois | ||
| EV stations | Not named | Oregon | ||
| EV stations | Not named | Massachusetts | ||
| EV stations | Not named | Massachusetts | ||
| EV stations | Not named | Massachusetts | ||
| EV stations | Not named | Massachusetts | ||
| EV stations | Not named | Massachusetts |
What each signal means for companies selling to station operators and installers
New EV charging stations
Public EV charging stations newly listed by the DOE Alternative Fuels Data Center. 2,509 are on file across 14 states, refreshed daily; the biggest page is California new EV charging stations with 815, then Massachusetts new EV charging stations with 300. A new charging site opened: that is what a seller reads in each record.
Who uses this data
Electrical contractors, Charging hardware vendors, Site hosts, Utilities programs, Maintenance providers. Describe your customer in a sentence, for example “I sell maintenance contracts to EV charging operators in Florida”, and Harbilo turns it into filters and a ranked list of companies. A new Construction Sales workspace opens with Hot Leads, Contractor Search, Building Permits, Contacts.
Who sells into EV charging
Public charging is built by networks and operators working through local contractors and property owners. Sellers come at it from four directions.
- Electrical contractors want to know which networks and operators are building in their territory, so they can get on an approved-installer list before the next site.
- Hardware and component vendors (chargers, switchgear, payment terminals, cable management) track which operators are expanding and what power levels they deploy.
- Maintenance and field-service providers look for installed stations, since every listed port is equipment that will need service.
- Site hosts, real-estate brokers and utilities program staff watch where stations cluster to judge which locations networks favor.
Signals that predict a purchase
A newly listed station. The Department of Energy's Alternative Fuels Data Center runs the Alternative Fueling Station Locator, which covers public and private EV charging stations, and accepts new stations for inclusion through a submission form.[1] A station that appears for the first time tells you an operator finished a project at a specific address. One completed site is weak evidence of anything. A run of new listings by the same network in one metro area is strong evidence of a build program, and a build program buys installation labor, equipment and service contracts repeatedly.
It helps to read the record in the listing's own terms. A *station location* is a physical place with one or more charging ports, such as a parking garage or lot. An *EV charging port* provides power to one vehicle at a time, even if it has several connectors. A *connector* is what plugs into the vehicle.[1] Port count, not station count, is the measure of how much equipment was installed.
Charging level. The listing separates Level 1, Level 2 and DC fast ports.[2] Level 2 equipment runs on 240-volt or 208-volt service and is common at workplaces and public destinations.[1] DC fast sites involve heavier electrical work and larger budgets. The level tells an electrical contractor whether the job resembles a commercial branch-circuit project or a utility-coordinated service upgrade, and tells a maintenance provider what skills the site needs.
Federal program standards. Stations built with federal highway funds under the national charging program must meet published minimums: at least four network-connected ports able to charge four vehicles at once; for corridor sites, DC fast ports rated for at least 150 kilowatts each; and an average annual uptime above 97 percent for each port.[3] States or other direct recipients must keep those chargers maintained in compliance for at least five years from the start of operation, and must ensure installation and maintenance is done by a qualified workforce.[3] An uptime requirement with a five-year tail is a standing reason for an operator to buy monitoring and maintenance.
A prospecting workflow
- Set the territory and the equipment class. Decide which states or metro areas you serve and whether Level 2, DC fast or both fit your offer.
- Search new EV charging stations in Harbilo by state and date, and filter by network and by charging level.
- Group by network and operator. You are looking for the operators behind repeated new listings in your area, not for individual addresses.
- Look up the operator or network as a company. A station record names a network and a location; it does not name the installer, and it often does not name the property owner. Use company search and the company profile to see what else is on record for the operator.
- Find a contact at the operator for the function you sell to: construction or deployment for installers, operations or reliability for maintenance, procurement for hardware.
- Create an alert for new stations in your territory so you see an operator's second and third sites as they are listed.
- Export or pull by API with station address, port counts and level, so a proposal can refer to the operator's actual footprint.
Timing
A listing is a trailing signal for construction and a leading signal for service. By the time a station is listed, the installation contract for that site is finished. What the listing predicts is the operator's next site and the maintenance need at this one.
The data center shows a "last updated" date on its station counts and offers historical counts by date, and it can flag stations as temporarily unavailable.[2] Its counts cover public and private stations but exclude residential charging.[2] The date a station is added to the listing can differ from the date it opened, so treat "new" as newly listed.
For installers, the useful cadence is monthly: review which operators added sites, and approach those with two or more additions. For maintenance providers, a station that changes to temporarily unavailable is the more urgent signal than a new one.
Outreach compliance notes
The people you contact here are employees of networks, utilities, property companies and public agencies, reached at work. The general federal rules for commercial outreach apply in their plainest form.
- Email. The FTC's guidance on the CAN-SPAM Act says the law draws no line between consumer and business recipients. A commercial message must not use false or misleading header information or a deceptive subject line, must be identified as an ad, must give the sender's valid physical postal address, and must explain how to opt out. Opt-out requests must be honored within 10 business days, and the mechanism has to keep working for at least 30 days after the message is sent. Each violating email is subject to penalties of up to $53,088.[4]
- Phone. The FTC says most telemarketer-to-business calls are exempt from the Telemarketing Sales Rule.[6] Separately, FCC rules prohibit autodialed or prerecorded-voice calls to cellular numbers without prior express consent, and require written consent when such a call is telemarketing.[5]
- Public-sector hosts. Some stations sit on city, transit or university property. Those owners buy through procurement processes with their own contact rules during a solicitation, which are set by the agency and are outside this summary.
None of this is legal advice; it describes what the published federal materials say.
Metrics to track
- Operators identified per 100 new stations: how concentrated the build activity in your territory is.
- Share of new ports by level, to match your offer to what is being installed.
- Contact-found rate at operator level.
- Days from listing to first contact.
- Proposals and approved-vendor placements per operator, which matter more than per-station wins.
- Sites served per operator over time, the measure of whether one relationship is turning into repeat work.
Sources
- Electric Vehicle Charging Stations, U.S. Department of Energy, Alternative Fuels Data Center
- Alternative Fueling Station Counts by State, U.S. Department of Energy, Alternative Fuels Data Center
- 23 CFR Part 680, National Electric Vehicle Infrastructure Standards and Requirements, Electronic Code of Federal Regulations (National Archives and Government Publishing Office)
- CAN-SPAM Act: A Compliance Guide for Business, Federal Trade Commission
- 47 CFR 64.1200, Delivery restrictions (telephone solicitation rules), Electronic Code of Federal Regulations (National Archives and Government Publishing Office)
- Complying with the Telemarketing Sales Rule, Federal Trade Commission
Reviewed Oct 11, 2026.
Frequently asked
What energy and ev data does Harbilo have?
1 datasets with live pages: New EV charging stations. Together they hold 2,509 records across 14 states.
Which dataset has the most records?
New EV charging stations, with 2,509 records on file in 14 states.
How fresh is the energy and ev data?
The newest change on any of these pages was recorded on Oct 10, 2026. Each dataset has its own schedule: New EV charging stations daily.
Who uses this data?
Electrical contractors, Charging hardware vendors, Site hosts, Utilities programs, Maintenance providers. Each record names the organization involved where the source does, so a seller can go from the signal to the company and its contacts.